Weedon Bec Parish Council

Serving the people of Weedon Bec

Clerk: Mrs Susan Halkett
16, St Mary's Way, Weedon
Northamptonshire NN7 4QL

Latest News

A5 KILSBY TO WEEDON Multi-Disciplinary Project

Update Bulletin 18 – 28.11.2019

We are currently carrying out drainage works in Phase 7, from B5385 Watford to A361 at Kilsby roundabout.

Between 8pm Friday 29th November and 6am Monday 2nd December, we are planning to carry out resurfacing in Phase 6, from B4036 Long Buckby to B5385 Watford, heading northwards from a point approximately 300 metres north of the bridge over The Grand Union Canal... Read More »

Posted: Fri, 29 Nov 2019 08:48 by Susan Halkett

Tags: News

Jubilee Field slide

Jubilee Field slide

The new slide is nearly completed on the slope at Jubilee Field. Inspection report to be carried out on Saturday morning.

Posted: Thu, 28 Nov 2019 16:09 by Susan Halkett

Tags: News

A5 KILSBY TO WEEDON Multi-Disciplinary Project Update Bulletin 17 – 21.11..2019

*** STOP PRESS ***

Please note that, because of forecasted rainfall this weekend, we will NOT be carrying out resurfacing works in Phase 6, from B4036 Long Buckby to B5385 Watford this weekend.

However, we will be carrying out main drainage works in Phase 6 from 8pm Friday 22nd until 6am Saturday 23rd November instead.

This means that the A5 will remain open between Kilsby and Weedon from 6am Saturday... Read More »

Posted: Fri, 22 Nov 2019 08:37 by Susan Halkett

Tags: News

A5 KILSBY TO WEEDON Multi-Disciplinary Project Update Bulletin 17a – 19.11.2019

Last weekend, resurfacing works to the A5 in Phase 6, from B4036 Long Buckby to B5385 Watford, were substantially completed from a point approximately 100 metres south of the access to Old Watling Street to a point approximately 300 metres north of the bridge over The Grand Union Canal,

Unfortunately, owing to unforeseen circumstances, resurfacing of the entrances to Old Watling Street, the canal side... Read More »

Posted: Wed, 20 Nov 2019 09:50 by Susan Halkett

Tags: News

NOTIFICATION OF ESSENTIAL MAINTENANCE WORKS A5 TOWCESTER ROUNDABOUT TO WEEDON

I am writing to let you know that we will be carrying out essential maintenance work on the A5, between Towcester Roundabout and Weedon.
During this comprehensive scheme of work, we will carry out tree and vegetation clearance, repair and replace damaged drains, clear and re-profile drainage ditches, resurface and re-align the carriageway to remove flat spots, renew the footway and damaged kerbs, refresh... Read More »

Posted: Tue, 19 Nov 2019 17:13 by Susan Halkett

Tags: News

A5 KILSBY TO WEEDON Multi-Disciplinary Project

Update Bulletin 17 – 14.11.2019

We are currently carrying out drainage works in Phase 6, from B4036 Long Buckby to B5385 Watford and at the B5385 Watford / Welton junction. Work at the junction is being carried out using temporary 3-way traffic signal control with the Welton / Ashby St. Ledgers road being closed. These drainage works are being carried out overnight between 8pm and 6am Monday to... Read More »

Posted: Thu, 14 Nov 2019 16:56 by Susan Halkett

Tags: News

Official opening of the play equipment on Croft Way playing field.

Official opening of the play equipment on Croft Way playing field.

Mr Tony Crease, Chairman of the Parish Council welcomed everyone who came along to the official opening of the new play equipment at Croft Way playing field and gave a brief insight of how this came about following the questionnaire to the village last year. The four items of play equipment, new bench and picnic table and footpath from the Village Hall to the Whettles, were funded by the Parish Council... Read More »

Posted: Thu, 07 Nov 2019 16:45 by Susan Halkett

Tags: News

A5 KILSBY TO WEEDON Multi-Disciplinary Project - Update Bulletin 16 – 31.10.2019

Please note that, because of forecasted heavy rainfall, we will NOT be carrying out the resurfacing works in Phase 6, from B4036 Long Buckby to B5385 Watford planned for this weekend.

However, we will be carrying out main drainage works in Phase 6 between 8pm Friday 1st and 6am Saturday 2nd November 2019. This means that the A5 will remain open between Kilsby and Weedon from 6am Saturday 2nd to 8pm... Read More »

Posted: Fri, 01 Nov 2019 08:36 by Susan Halkett

Tags: News

Weedon Art Buddies Exhibition

Weedon Art Buddies Exhibition

Come along and visit the Art and Craft Exhibition on Saturday 26th October, 10.30 am - 4 pm at the Village Hall

Posted: Fri, 25 Oct 2019 08:50 by Susan Halkett

Tags: News

A5 KILSBY TO WEEDON Multi-Disciplinary Project Update Bulletin 15 – 17.10.2019

*** STOP PRESS ***

Please note that, because of forecasted heavy rainfall on Friday and Saturday, we will NOT be carrying out resurfacing works in Phase 6, from B4036 Long Buckby to B5385 Watford this weekend.

This means that the A5 will remain open between Kilsby and Weedon from 6am Friday 25th to 8pm Monday 28th October 2019. We are planning to return and continue main drainage works to Phase 6 at... Read More »

Posted: Thu, 24 Oct 2019 15:43 by Susan Halkett

Tags: News

Subscribe to RSS Feed Help for RSS Feeds